Starbase Rack - Assembly Instructions
ALWAYS ASSEMBLE UPSIDE DOWN
- From the Starter Pack, take out the top shelf and 3 spike assemblies, and remove the top caps.
- Start with the shelf inverted and have the top cap threads inserted and pointed upwards.
- Remove 3 spacer tubes from the Shelf Pack and firmly screw onto the upward projecting top cap threads.
- From your next choice of Shelf Pack remove and slide over upward projecting screw threads.
- Repeat 3 and 4 above to build rack to required height.
- Remove spikes from Starter Pack and screw firmly onto upward projecting screw threads.
- Finally tighten all spacer tubes into upright position. N.B. Recesses with discs are for the location of the vibration control platforms.
N.B. The rack MUST be level.

